How much does a kitchen remodel cost in dubai?

Kitchen remodel costs in Dubai depend on your choices. The kitchen is more than just a place to cook; it is the heart of the home, a reflection of your lifestyle, and often a sign of luxury. Costs can vary a lot, whether you are updating finishes or planning a custom designer kitchen.

Typical Kitchen Cost Range

Entry-Level Refresh (AED 8,000 – 15,000)

Ideal for people who live in apartments or who are on a tight budget. The package covers cabinet repainting, fixture replacement, and surface upgrades.
 
Mid-Range Renovation (AED 15,000 – 40,000)
 
Perfect for families who want both usefulness and a good look; consider new cabinetry, quartz countertops, modern flooring, and energy-efficient appliances.
 
Luxury Remodel (AED 50,000 – 150,000+)
 
It is designed for villa owners and people interested in design, offering custom cabinetry, imported marble, smart appliances, and full layout redesigns.

What Drives the Kitchen Remodeling Cost?

  • The materials and finishes include imported marble, designer tiles, and high-end fittings.
  • Appliances include smart fridges, built-in ovens, and luxury cooktops.
  • Labor and craftsmanship: skilled artisans and contractors based in Dubai.
  • Customization options include frameless cabinets, concealed storage, and specially designed layouts.
  • Building regulations could increase the budget.

What is the average time for a full kitchen renovation?

1. BOQ & Estimation (2–3 Days)

  • It usually takes 2 to 3 days to finalize the bill of quantities and confirm the kitchen materials and appliances. After this, we move on to the next step. In Dubai, you must finalize the cost of the kitchen remodel before signing a contract with any company.

2. Design & Material Selection (7–10 Days)

  • During this stage, clients collaborate with our design team to choose finishes, fixtures, and layouts. This stage generally takes 7–10 days to finalize the design concept and material selections before preparing the final estimate.
 
 

3. Custom Kitchen Fabrication (15–20 Days)

  • Building a custom kitchen with made-to-order cabinets and finishes takes about 15-20 days, depending on the design’s complexity

.

4. Installation & Handover (2–5 Days)

  • The last step is installation. This usually takes 2 to 5 days, depending on the size and details of your kitchen. After that, we hand over your kitchen, ready for you to use.
  • A kitchen remodel in Dubai can sometimes be finished in just 10 days. However, larger or more complex projects may take up to 45 days, depending on your kitchen’s size and the availability of materials.

Do I need a permit for a kitchen remodel in Dubai?

To ensure a smooth kitchen renovation, we strongly advise obtaining the necessary permits from the Building Management beforehand. This will keep you in compliance with the regulations and will help you avoid any unforeseen interruptions or delays.

What is the best way to select a suitable kitchen contractor?

  • Look for contractors with a proven track record in kitchen remodeling projects
  • Check out their portfolio to see if their style fits with your vision—whether you’re looking for something modern, luxury, or functional.
  • In Dubai, specialized contractors tend to display villa kitchens, apartment upgrades, and custom designs.

Verify Credentials & Approvals

  • Make sure the contractor is licensed and well acquainted with Dubai’s building regulations; he should include all of these in the kitchen remodel cost.
  • Inquire whether they handle permits through building management to prevent delays.

 

You can click on our Home Renovation Tips to get a better idea of overall renovation

Your Kitchen Remodeling is about to take off

Schedule a free consultation with our team and let’s make things happen!